Institutional work has the tightest constraints in the market. Schools have a summer window. Hospitals have infection control and departments that never close. Labs have equipment that cannot be shut down and vibration limits that most contractors have never had to meet.
Platinum works inside those constraints on structural steel scopes across Greater Boston's institutional building stock.
Typical scopes
- School additions, gym and cafeteria framing, summer-window renovations
- University lab and research building fit-out steel
- Hospital equipment support, MRI and imaging suite framing, rooftop dunnage
- Elevator, stair and shaft framing cut into existing institutional buildings
- Mezzanines, catwalks and equipment platforms in mechanical spaces
